GEPCO provides facility to its customers to get the New Connection from Manual Application submission as well as Online Application submission. Both application methods are defined in details with all the documents required to acquire the New Connection from Gujranwala Electric Power Company (GEPCO).
Moreover, If you’re constructing a new house and seeking a GEPCO New Connection, you no longer need to visit the electricity office. You can complete the GEPCO Online Application from the comfort of your home.
However, you might be unsure about how to fill out the online application form for GEPCO’s new connection. The procedure is straightforward, and you only need the necessary documents.
The GEPCO online system enables you to apply for a new connection online. You’ll need to provide personal information as well as details about the plot where the new connection will be installed.
GEPCO New Connection
When you require a new electrical meter at your house, it’s important to determine the load you need. If you have a small house with few appliances, a single-phase meter should suffice. Most domestic houses install a single phase because it can handle 15 KW (15000 watts) of power, which is sufficient for smaller houses.
On the other hand, a three-phase meter is required in larger houses where power consumption exceeds 15 KW. While the three-phase meter is primarily used for commercial purposes, you can also apply for it for domestic use if your load is high.
Regardless of whether you need a single-phase or three-phase meter, there are two methods to apply for a “GEPCO New Connection” at your home. Let’s examine each method.
GEPCO New Connection: Manual Procedure
The traditional method, which is still in use and preferred by many users, involves visiting the nearest GEPCO office in your area. Here are the steps:
- Visit the subdivision GEPCO office and collect the new connection form.
- Fill in the requested information in the form, such as the name of the connection person, phone number, address, etc.
- Attach a copy of your ID and proof of ownership. If you’re not the actual owner, you’ll need permission from the owner on stamp paper along with proof of ownership.
- Submit all the documents to the subdivision office for verification. You’ll receive a receipt once the information is verified.
Please note that it usually takes 1 to 3 months to get a new connection at your house using this method.
GEPCO New Connection: Online Application
The Gujranwala Electric Power Company (GEPCO) has made it easier for customers to apply online. The system is fully automated, so you don’t need to visit the office. You can stay at home and apply online for a new connection, which is the recommended method because it saves time and allows you to track the application status online.
Here’s how to apply:
- Go to the new connection application form online.
- Click on any image for a new connection, which will redirect you to the ENC website.
- Click on the ‘Apply’ box and provide Subdivision Information.
- When you select ‘Category Type’, a new form will open below it.
- Select the connection type, provide Applicant’s Particulars details, Contact Person Information, Premises Detail, and attach all required documents.
- Attach the JPEG format of below listed documents, when applying for New Connection from GEPCO:
- Property Document Copy
- Attested CNIC Copy of Applicant
- Attested CNIC Copy of Witness
- Neighbors Electricity Bill Copy
- Wiring Contractor`s Test Report
- Finally, check the ‘I Agree’ box and click on the ‘Submit’ button.
After submitting your application, it will be forwarded to the higher authority of GEPCO for verification. They will then visit your site location and prepare a feasibility report.
Once the site visit is completed by the electrical office, you’ll need to wait for one month. The GEPCO officer will issue the meter in your name, and your new connection will be installed at your house.
Summary
Consumes from the areas covered by Gujranwala Electric Power Company can avail the benefits to get the New Connection by submitting their Application Online as well as Manually by visiting the nearest GEPCO office. Complete procedure to proceed for the new connection is explained in details. Further, You can also visit Electricity New Connection (ENC) System for further details.